Egypt
The proposed project activity is devolved as multiple project activities in accordance with guidance given under Para 3.6.4 of VERRA Standard Version 4.4. The main aim of the project activity is to install anaerobic digester to achieve methane recovery and gainful use of recovered methane i.e., electricity generation. The multiple project activities are installed, operated, owned by Empower capital. Project activity 1; involves the implementation of animal waste management system in the dairy farm owned by Empower capital located at Nubaria, Egypt. The animal manure generated in the dairy farm would be treated in anaerobic digester & recovered methane shall be used to generate electricity for captive consumption. Project activity 2; involves implementation of wastewater sludge treatment plant at Engas NRE, located at Sakha, Egypt. The wastewater sludge will be treated in anaerobic digester & recovered methane shall be used to generate electricity. The generated electricity will deliver to grid for third party sale/ purchase under an agreement.
The expected start of the crediting period
2023-06-29
The expected end of the crediting period
2030-06-28
Project type
Carbon Credits To Be Issued
Validation Body
EcoLance Private Limited
Validation Date
31-01-2025
Verification Body
To be announced
Methodology
AMS-I.C.,AMS-III.D.,AMS-III.H.
Project Developer
South Pole
Registry
Verra (VCS)
Project ID
4437
Sector
Energy Distribution
Project duration
7 Years
Average annual emission reductions
Country
Egypt
Coordinates
31.084697, 30.962018
The Climate Projects Registry is a voluntary registry jointly established by Egyptian governmental entities to serve as an overarching database for emission reduction project within Egypt.